變電站用英語(yǔ)怎么說(shuō)
變電站用英語(yǔ)怎么說(shuō)
變電站,改變電壓的場(chǎng)所。為了把發(fā)電廠發(fā)出來(lái)的電能輸送到較遠(yuǎn)的地方,必須把電壓升高,變?yōu)楦邏弘?,到用?hù)附近再按需要把電壓降低,這種升降電壓的工作靠變電站來(lái)完成。變電站的主要設(shè)備是開(kāi)關(guān)和變壓器。按規(guī)模大小不同,小的稱(chēng)為變電所。那么你知道變電站用英語(yǔ)怎么說(shuō)嗎?下面來(lái)學(xué)習(xí)一下吧。
變電站英語(yǔ)說(shuō)法1:
substation
變電站英語(yǔ)說(shuō)法2:
converting station
變電站英語(yǔ)例句:
變電站自動(dòng)化系統(tǒng)的不停電換型改造
Without power cut retrofit modification of transformer substation automation system
最后,也對(duì)變電站的其他二次回路進(jìn)行了初步設(shè)計(jì)。
At last, also to transformer substation of other two times back track carried on the first step design.
風(fēng)機(jī)與變電站之間的通訊,光纖采用什么方式連接?
Between the wind turbine generator and the transformer substation communicate on, what way connection does the optical fiber use?
據(jù)新華社報(bào)道,目前四川省有五所電站和六所變電站停止運(yùn)轉(zhuǎn)。
The Xinhua News Agency said five power stations were put out of action and six transformer substations were shut down in Sichuan.
泵房應(yīng)該已棄置。在河堤的后面是一個(gè)變電站。你看到有人已經(jīng)開(kāi)始做晚飯了嗎?
The pump room should have been discarded.there is a transformer substation behind the river bank.can you find someone is preparing for the supper?
提出了一種基于多神經(jīng)網(wǎng)絡(luò)的分布式箱式變電站故障診斷系統(tǒng)的結(jié)構(gòu)和構(gòu)建方法,并介紹了對(duì)故障特征信息進(jìn)行模糊化處理的方法。
The structure and construction method of one kind of distributed fault diagnosis system for box-type transformer substation based on multiple artificial neural networks are described.
從營(yíng)銷(xiāo)檔案管理系統(tǒng)獲取變電站、線路、變壓器、臺(tái)區(qū)、重點(diǎn)用戶(hù)檔案信息、柘補(bǔ)關(guān)系、采集點(diǎn)檔案信息。
Acquire archival information on transformer substation, line, transformer, substation area, key users, topological relation and acquisition point from marketing archive management system.
移動(dòng)機(jī)器人在變電站設(shè)備巡檢系統(tǒng)中的應(yīng)用研究
Research of A Mobile Robot for Substation Equipment Inspection System
恢復(fù)了4座鐵路牽引變電站的供電。
Power supply for4 railway traction substations has been resumed.
文章構(gòu)建了一個(gè)采用西門(mén)子S7-300可編程控制器作為控制單元的變電站自動(dòng)化系統(tǒng)的實(shí)現(xiàn)方案。
This article constructs the plan on the electric substation automation system on the basis of Siemens S7-300 programmable controller.
基于混沌時(shí)間序列的變電站設(shè)備溫度預(yù)測(cè)對(duì)噪聲調(diào)頻干擾源的站間到達(dá)時(shí)差測(cè)量
Temperature Prediction for Substations Based on Chaotic Time Series Estimation of TDOA for Locating Noise-Frequency Modulation Jammer in Passive System
某變電站內(nèi)一次典型的線路故障驗(yàn)證了該系統(tǒng)的實(shí)用性和有效性。
The practicability and validity are verified by its analytic results for a typical transmission line fault of a substation.
非金屬接地模塊在變電站接地網(wǎng)中的應(yīng)用
The Applications of Nonmetal Module to Ground Grid of Substations
基于LCM及風(fēng)險(xiǎn)評(píng)估的變電站改造決策
Decision-making for substation retrofits based on LCM and risk assessment
變電站二次典型設(shè)計(jì)中繼電保護(hù)技術(shù)原則
Protection technology principles for typical design of substation secondary system
某110kV半戶(hù)內(nèi)變電站周?chē)姶怒h(huán)境監(jiān)測(cè)及分析
Electromagnetic Environment Monitoring on a 110 kV Half Indoors Substation
青銅峽變電站RTU改造方案及實(shí)施
The retrofitting schemes and implementation of RTU in Qingtongxia Substation
四川省北面的陜西省也有三家發(fā)電站和兩家變電站遭到破壞。
Three more power stations and two substations have been knocked out in Shaanxi province to the north of Sichuan.
隨著新設(shè)備、新技術(shù)的大量應(yīng)用,變電站自動(dòng)化程度越來(lái)越高。
Along with the application of new equipments and technology, automation degree of substation becomes more and more advanced.
變電站建設(shè)進(jìn)度計(jì)劃模型中的時(shí)間不確定性研究
Research on Temporal Uncertainty in Substation Construction Schedule Planning Module